By Being in Engineering Industry and being a leader in manufacturing Construction Equipment, calls for mammoth and advanced production unit. Spartan boasts of State-of-the-Art manufacturing facility at Bhiwandi on Mumbai-Nashik highway. It is fully equipped with world class equipments to manufacture an array of construction equipments & Fire Evacuation Lifts. It is spread across 5 acres with 1 lac Sq.ft. build-up Shed & Office. The production facility covers Fabrication, Production Assembly, Testing, R&D, Design & Development, Spares Management & Despatch.

Spartan aims at making a world class manufacturing plant. Spartan's Managing Director Dr Vikram Mehta is committed to make it happen. He visits various manufacturing plants across globe, he aims to implement the best practices at Spartan's Bhiwandi facility. This has given birth to "Operational Excellence Apex Committee". This committee is lead by the CEO, followed by Department heads of Production, Design, Quality, Stores, Purchase and more.

State of the art infrastructure

Spartan's State-of-the-Art manufacturing facility at Bhiwandi on Mumbai-Nashik highway is fully equipped with world class equipments to manufacture an array of construction equipments & Fire Evacuation Lifts. It is spread across 5 acres with 1 lac Sq.ft. build-up Shed & Office. The production facility covers Fabrication, Production Assembly, Testing, R&D, Design & Development, Spares Management & Dispatch.

Facility 1 Facility 2

Spartan follows sequence of processes to come up with a final equipment. Following are the brief processes which we follow:

We hold NPD (New Product Development) meetings, where each of HOD from various departments like design, production, marketing, customer care, etc. come together to discuss on various successful machines across the globe. Our design team participates exhibitions across India & globe to study the industry and machineries. This helps us to narrow down on a particular machinery which is appropriate to Indian site conditions. These machines are discussed and finalized during NPD meetings and sent to design team for further development.

Once this design is ready it is shared with production team to prepare a proto type.Once this proto type is manufactured it is tested in house and also at site to ensure smooth operations at all possible and critical conditions. After certain modifications and successful running of the equipment it is sent to production for mass manufacturing.

Process 1 Process 2

Production

Production 1

Machine We use AMADA CNC Punching machine for all hoist sheet metal components. It has High rate of accuracy and consistent repeatability. It is easy to operate and any complex machining operations is also made easy.

Production 2

GI sheet GSM120 grade is used for all sheet metal components and in addition to that PP powder coating is done on it which gives superior finish and longer life along with corrosion protection.

Production 3

Horizontal Machining Centers (HMC) perform better in speed, accuracy and reliability. It’s high-speed, high-performance spindles feature supports us in achieving the speed and part quality that matter the most.

Production 4

Structural Fabrication is done through fixtures to maintain uniformity and interchangeability. Fabrication is done through certified WPS (Welding Procedure Systems) welders.

Other important machining strengths

Machining 1
Machining 2
Machining 3
Machining 4
Machining 5
Machining 6
Machining 7
Machining 8

Surface treatment

All sheet metal and some structural parts go through 11 tank process and PP Powder Coating which gives superior finish and long life protection from corrosion.

Advantages of Powder Coating:

Powder coated surfaces are more resistant to chipping, scratching, fading, and wearing than other finishes.

Colors stay bright and vibrant longer.

Powder coating does not contain solvents which have pollutants known as volatile organic compounds (VOC's). It protects the environment.

The result is a uniform, durable, high quality with attractive finishing.

High quality RP Powder is used for Powder Coating

Powder Coating 1 Powder Coating 2

Hot Dip Galvanization

Galvanization 1 Galvanization 2

Hot Dip Galvanization

Most of structural component of hoist like mast, wall tie base frame carriage and cage base etc are hot dip galvanized with 80 to 100 GSM.

Galvanization is the process of applying a protective zinc to steel or iron in order to prevent rusting.

Zinc is extremely durable in all whether conditions.

Galvanized surface is scratch resistance and high in aesthetics.

Hard Chrome Plating

Hard Chrome plating is done as a technique of electroplating a thin layer of chromium onto a metal object. The chromed layer can be decorative, provides corrosion resistance, eases cleaning procedures, and increases surface hardness.

Hard Chrome Plating

Hard Chrome Plating 1 Hard Chrome Plating 2

Inspection & testing

Assembly Inspection

Assembly Inspection

Confirms that all the components are visually inspected.

Proper assembly fitment & movement of components is done.

Feedback mechanism is followed directly from fitters.

If there is a problem in assembly, immediate corrective action

Flywheel Runout & Dynamic Balancing

Flywheel Balancing

100% Flywheel Runout

Inspection with Dial Indicator

100% Flywheel - Dynamic Weight Balancing

100% Noise Testing

Noise Testing

100% Noise Testing Acceptance ≤ 80 db

100% Functional Testing

Functional Testing

100% testing in Machines with

maximum Rod & maximum

Grade TMT Bar Cutting

Final Inspection

Final Inspection

Functional & visual testing

Completeness of machine check according to BOM

inspection as per checklist

Inspection of Toolbox with Accessories

Toolbox Inspection

Check for proper quantity of required accessories.

Anti-rust is applied.

Confirms better aesthetic looks.

Confirms that the machine manual is included.

Confirms the packing list is duly checked & signed.

Fixtures

Advantages of In-House Fixtures:

Fixtures to be maintained identical fabrication dimension & geometry to make standard quality parameters as per drawing. Interchangeability fitment of mast with each other | Reduces time and efforts

Fixture 1
Fixture 2
Fixture 3

Machine testing

Hoist Machine Testing

Hoist Testing

All the components duly fitted as per assembly drawing is confirmed.

Visual inspection of all the components are done.

Proper assembly fitment & movement of components are carried out.

Feedback mechanism is followed directly fitters level.

If there is problem in assembly at immediate corrective action is taken..

100% Machine Assembly, Performance, safety & Load Trail Inspection with calibrated load are carried out.

Electric Panel Testing

Panel Testing 1 Panel Testing 2

Proper tightening of all wires are confirmed.

All panel logics are checked properly

All hoist safety limit & sensor proper working is confirmed.

VFD parameter are entered properly as per motor make.

Drawing of electric wiring is placed in panel.

Quality control

Precision Calipers and Micrometers
Plug and Ring Gauges
Radius and Feeler Gauges
Hardness Testing Machine
Keyway Slip Gauge Inspection
Bench Center Testing
Gauges Make Better Quality & Productivity
Plug Gauges
Ring gauges
Ring with key way gauge
Thread gauges
Radius Gauges
V groove gauge
Filler gauges
Other Special Instruments Make Better Quality & Productivity
Surface plate, Height gauge, Dial with stand like all required instruments are available BENCH CENTER : for checking run out, concentricity & parallelism Hardness Testing Machine Slip gauges
Fixtures
Fixture to maintain identical fabrication dimension & geometry to make standard quality parameters as per drawing. Interchangeability fitment of mast with each other. Reduce time and efforts.
Machine Testing
Confirm all the components duly fitted as per assembly drawing . Visual inspection of all the components. Proper assembly fitment & movement of components. Feedback mechanism directly from fitters level. If there is problem in assembly takes immediate corrective action. Doing 100% Machine Assembly, Performance, safety & Load Trail Inspection with calibrated load
Supplier Quality Assurance:
Approved list of vendors & suppliers with self certified Vendor education regarding the quality requirement. Vendor training regarding the required documentation. Monthly Vendor rating calculation. Communication to the vendor regarding the modifications, reducing Rework –Rejections. Quarterly Vendor Meet.
Customer Support Quality Review Meet
Weekly customer support meet with all QA, Production, PPC, Design & Service heads to solve quality problems & customer complaints: Review of failure matrix.
Discussion on failure report
Action plan on failure through CAPA
Brain storming for improvements.
Capture design change.
Customer site visit for problem analysis.
Panel Testing
Checking all wire proper tightening. 100% Check the all panel logics 100% Check all hoist safety limit & sensor proper working. 100% Check proper VFD parameter enter as per motor make. Electric wiring drawing placed in panel.
NDT Testing
Doing NDT test randomly per batch production DP TEST – Penetrate test performing randomly mast to detect any flaw or welding defects on the surface of weld & proper fusion with material per batch so welder quality insure daily inspection
Failure Analysis
Failure analysis does through following steps: Dimensional & visual inspection. Hardness testing. Non Destructive Testing – UT, LPT, MPT, VT Chemical analysis & physical testing. Brainstorming for any repeated failure. Take action with CAPA.